Lean Culture & Continuous Defect Reduction
Client’s Industry: Custom Closet Design, Production & Installation

Further details coming soon …
Project Trigger:
Delivered Scope:
Value & Impact:
5S-Focused Lean & Warehouse Layout Design
Client’s Industry: HVAC – Heat Pump Installation

Further details coming soon …
Project Trigger:
Delivered Scope:
Value & Impact:
Inventory Accuracy & Warehouse Space Optimization
Client’s Industry: HVAC – Linear Actuator Distribution Centers

Further details coming soon …
Project Trigger:
Delivered Scope:
Value & Impact:
Lean Gemba Walk Initiation & Traceability
Client’s Industry: Seafood Processing

Further details coming soon …
Project Trigger:
Delivered Scope:
Value & Impact:
Lean 5S & Inventory Accuracy Measurement
Client’s Industry: Light Aircraft Rebuild, Repair & Modification
Project Trigger: Low profitability and risk of insolvency
Delivered Scope: We worked on this project as operational efficiency experts alongside a team of experts from the finance, HR and marketing fields. Our scope of work, primarily focused on floor efficiencies. Initial assessment revealed tremendous opportunities existed to streamline the work on the floor by taking a critical look where time and resources were wasted. We adopted a lean-philosophy-inspired approach which involved training client’s supervisors on the principles of lean operations and coaching a pilot 5S event. Later, the consulting team expert in charge of finance sought our help in creating a method and procedure to allow for an objective measurement of inventory accuracy, which we did.
Value & Impact: The company became showing signs of recovery in two months and went into the black in less than five months. Our 5S initiative was replicated in the two aircraft hangars and contributed enormously to efficiencies on the floor. Among others, the average stay time of an aircraft, of a reference job, was cut by approximately 25%. Improving inventory accuracy also meant that less stockout-caused delays were experienced.
Organization Structure Redesign & PMO Launch
Client’s Industry: Structural Steel Fabrication & On-site Erection

Further details coming soon …
Project Trigger:
Delivered Scope:
Value & Impact:
Reduction of Inventory Inaccuracies
Client’s Industry: Mobile Air Compressor Manufacturing

Further details coming soon …
Project Trigger:
Delivered Scope:
Value & Impact:
Project Management & PM Software Training
Client’s Industry: Education

Further details coming soon …
Project Trigger:
Delivered Scope:
Value & Impact:
Province-wide Tailored Project Management Training
Client’s Industry: Association of Manufacturers

Further details coming soon …
Project Trigger:
Delivered Scope:
Value & Impact:
Design of Inventory Measurement Procedure
Client’s Industry: Chemical Material Import & Distribution

Further details coming soon …
Project Trigger:
Delivered Scope:
Value & Impact:
Value Stream Mapping & Line Balancing
Client’s Industry: Domestic Boiler Manufacturing
Project Trigger: Increase production output rate without new capital injection
Delivered Scope: Consolidated and documented in-house knowledge of production processes, conducted time & motion studies, developed process charts for work standardization. Conducted value stream mapping to identify bottlenecks, which eventually led to rebalancing the production line and solving of the low-capacity problem at zero capital expenditure.
Value & Impact: Treatment of bottlenecks and elimination of wasteful activities resulted in an approximately 20% increase in throughput capacity. In the process, key staff members received training to retain the gains and embark on a continuous improvement path, going forward.